OCOLO Capacity Data

Let us assist you with finding capacity. Fill out a Bid My Project form to find a match.

Enter My Project

Need Megawatt Data Center Capacity?

OCOLO connects you with over 200 trusted data center service providers worldwide. We aggregate and list real-time megawatt power capacity across key global locations.

Whether you're looking to list available capacity or find the right infrastructure to support your project, our platform makes it easy to search by region or request tailored availability insights.

Need help or have specific requirements? Reach out to us at info@ocolo.io.

View Capacity Analytics Dashboard
Global Data Center Capacity Overview

Market intelligence from OCOLO's network of 594 active data center sites with megawatt capacity.

1,737.0 MW

Available Immediately

27,267.7 MW

Total Future Capacity
Near-term (2Q2026 - 2Q2028): 19,317.6 MW

6,692.0 MW

Build Upon Request

Global Capacity Distribution

MW Available, Planned, and Build-to-Suit by Region

Available MW (Ready Now)
Planned MW (All Future)
Build-to-Suit MW (Custom Build)
Regional Capacity Summary
Region Sites Available Now (MW) Future Total (MW) Near-term (MW) Build Upon Request (MW)
US - East 84 263.7 7,882.2 7,107.2 2,461.2
US - Central 76 180.8 7,615.0 5,058.0 2,740.9
US - West 37 181.3 1,345.2 861.0 23.6
North America 8 15.2 129.0 105.0 116.0
Latin America 8 34.8 376.0 258.0 0.0
Africa - Sub Saharan 4 20.0 213.5 149.5 0.0
Africa - North 1 2.0 0.0 0.0 0.0
Oceania 2 2.2 64.0 64.0 0.0
Asia 44 602.0 981.5 680.1 753.0
Europe - Eastern 1 53.0 0.0 0.0 0.0
Europe - Western 30 144.3 6,135.6 3,539.6 79.3
Europe - Nordic 13 216.1 2,273.7 1,428.2 518.0

Available Now: Capacity that can be contracted immediately • Future Total: All planned capacity regardless of timeline • Near-term: Capacity scheduled for 2Q2026-2Q2028 • Build Upon Request: Custom build capacity available with signed contracts

Regional Capacity by Quarter

Stacked view of planned capacity by region and quarter

Data Center Capacity Insights

Frequently asked questions about global wholesale data center availability

1,737.0 MW is available immediately across 594 sites globally. This represents capacity that customers can contract for today without waiting for construction.

27,267.7 MW of total future capacity is planned globally across all timelines. In the near-term window (2Q2026 to 2Q2028), 19,317.6 MW is scheduled to come online. The quarter with the most new capacity is 4Q2027 with 6,109.5 MW.

Top regions for build-upon-request capacity: US - Central with 2740.9 MW, US - East with 2461.2 MW, Asia with 753.0 MW, Europe - Nordic with 518.0 MW, North America with 116.0 MW .

Available Now: 263.7 MW across 84 sites

Largest Single Block: 52.0 MW

Near-term Future Planned Capacity (2Q2026-2Q2028): 7,107.2 MW

Build Upon Request: 2,461.2 MW

Typical Build Timeline: 12 months (range: 3-24 months)

Total Future Planned Capacity: 7,882.2 MW

Cooling: 8 sites with liquid cooling, 25 sites with hybrid (liquid and air) cooling

US - East region includes major metropolitan areas and data center markets: New York City, New Jersey, Washington DC, Northern Virginia, Ashburn, Boston, Massachusetts, Philadelphia, Pennsylvania, Atlanta, Georgia, Miami, Florida, Richmond, Virginia, Baltimore, Maryland, Charlotte, North Carolina, Raleigh, North Carolina, Chicago, Illinois, Detroit, Michigan, Columbus, Ohio, Cleveland, Ohio, Pittsburgh, Pennsylvania, Buffalo, New York, Hartford, Connecticut, Providence, Rhode Island, Portland, Maine, and surrounding suburban areas.

Available Now: 180.8 MW across 76 sites

Largest Single Block: 20.0 MW

Near-term Future Planned Capacity (2Q2026-2Q2028): 5,058.0 MW

Build Upon Request: 2,740.9 MW

Typical Build Timeline: 18 months (range: 4-24 months)

Total Future Planned Capacity: 7,615.0 MW

Cooling: 5 sites with liquid cooling, 28 sites with hybrid (liquid and air) cooling

US - Central region covers central United States markets including: Chicago, Illinois, Detroit, Michigan, Columbus, Ohio, Cleveland, Ohio, Dallas, Texas, Houston, Texas, Austin, Texas, San Antonio, Texas, Oklahoma City, Oklahoma, Kansas City, Missouri, St. Louis, Missouri, Minneapolis, Minnesota, Milwaukee, Wisconsin, Indianapolis, Indiana, Nashville, Tennessee, Memphis, Tennessee, Louisville, Kentucky, New Orleans, Louisiana, Little Rock, Arkansas, Omaha, Nebraska, Des Moines, Iowa, and surrounding areas.

Available Now: 181.3 MW across 37 sites

Largest Single Block: 22.0 MW

Near-term Future Planned Capacity (2Q2026-2Q2028): 861.0 MW

Build Upon Request: 23.6 MW

Typical Build Timeline: 20 months (range: 12-24 months)

Total Future Planned Capacity: 1,345.2 MW

Cooling: 5 sites with liquid cooling, 9 sites with hybrid (liquid and air) cooling

US - West region encompasses key technology hubs and data center locations: San Francisco Bay Area, California, San Jose, Silicon Valley, Los Angeles, California, Seattle, Washington, Portland, Oregon, Las Vegas, Nevada, Phoenix, Arizona, Denver, Colorado, Salt Lake City, Utah, Sacramento, California, San Diego, California, Fresno, California, Spokane, Washington, Boise, Idaho, Albuquerque, New Mexico, and adjacent metropolitan regions.

Available Now: 15.2 MW across 8 sites

Largest Single Block: 4.0 MW

Near-term Future Planned Capacity (2Q2026-2Q2028): 105.0 MW

Build Upon Request: 116.0 MW

Typical Build Timeline: 12 months (range: 6-30 months)

Total Future Planned Capacity: 129.0 MW

Cooling: 1 sites with liquid cooling, 1 sites with hybrid (liquid and air) cooling

North America region encompasses non-US North American markets including: Mexico City, Mexico, Guadalajara, Mexico, Monterrey, Mexico, Tijuana, Mexico, Toronto, Canada, Montreal, Canada, Vancouver, Canada, Guatemala City, Guatemala, San Salvador, El Salvador, Tegucigalpa, Honduras, Managua, Nicaragua, San José, Costa Rica, Panama City, Panama, Havana, Cuba, Kingston, Jamaica, Santo Domingo, Dominican Republic, Port-au-Prince, Haiti, and other Central American and Caribbean locations.

Available Now: 34.8 MW across 8 sites

Largest Single Block: 15.0 MW

Near-term Future Planned Capacity (2Q2026-2Q2028): 258.0 MW

Build Upon Request: 0.0 MW

Typical Build Timeline: 18 months (range: 12-36 months)

Total Future Planned Capacity: 376.0 MW

Cooling: 2 sites with hybrid (liquid and air) cooling

Latin America encompasses Latin American data center markets: São Paulo, Brazil, Rio de Janeiro, Brazil, Buenos Aires, Argentina, Santiago, Chile, Lima, Peru, Bogotá, Colombia, Caracas, Venezuela, Quito, Ecuador, La Paz, Bolivia, Montevideo, Uruguay, Asunción, Paraguay, and other major South American metropolitan regions.

Available Now: 20.0 MW across 4 sites

Largest Single Block: 7.0 MW

Near-term Future Planned Capacity (2Q2026-2Q2028): 149.5 MW

Build Upon Request: 0.0 MW

Typical Build Timeline: 18 months (range: 12-36 months)

Total Future Planned Capacity: 213.5 MW

Cooling: 4 sites with hybrid (liquid and air) cooling

Africa - Sub Saharan covers Sub-Saharan African markets including: Johannesburg, South Africa, Cape Town, South Africa, Lagos, Nigeria, Nairobi, Kenya, Accra, Ghana, Dakar, Senegal, Abidjan, Côte d'Ivoire, Kampala, Uganda, Dar es Salaam, Tanzania, and other major Sub-Saharan African cities with growing data center infrastructure.

Available Now: 2.0 MW across 1 sites

Largest Single Block: 2.0 MW

Near-term Future Planned Capacity (2Q2026-2Q2028): 0.0 MW

Build Upon Request: 0.0 MW

Typical Build Timeline: 18 months (range: 12-36 months)

Total Future Planned Capacity: 0.0 MW

Cooling: 1 sites with hybrid (liquid and air) cooling

Africa - North includes North African data center locations: Cairo, Egypt, Alexandria, Egypt, Casablanca, Morocco, Rabat, Morocco, Tunis, Tunisia, Algiers, Algeria, Tripoli, Libya, and other emerging North African technology hubs along the Mediterranean coast.

Available Now: 2.2 MW across 2 sites

Largest Single Block: 1.2 MW

Near-term Future Planned Capacity (2Q2026-2Q2028): 64.0 MW

Build Upon Request: 0.0 MW

Typical Build Timeline: 18 months (range: 12-36 months)

Total Future Planned Capacity: 64.0 MW

Cooling: 1 sites with hybrid (liquid and air) cooling

Oceania includes Pacific region data center markets: Sydney, Australia, Melbourne, Australia, Brisbane, Australia, Perth, Australia, Adelaide, Australia, Auckland, New Zealand, Wellington, New Zealand, Christchurch, New Zealand, and other major cities across Australia, New Zealand, and Pacific island nations.

Available Now: 602.0 MW across 44 sites

Largest Single Block: 100.0 MW

Near-term Future Planned Capacity (2Q2026-2Q2028): 680.1 MW

Build Upon Request: 753.0 MW

Typical Build Timeline: 12 months (range: 12-18 months)

Total Future Planned Capacity: 981.5 MW

Cooling: 1 sites with liquid cooling, 19 sites with hybrid (liquid and air) cooling

Asia includes major Asian data center markets: Tokyo, Japan, Singapore, Hong Kong, Seoul, South Korea, Mumbai, India, Bangalore, India, Delhi, India, Sydney, Australia, Melbourne, Australia, Bangkok, Thailand, Jakarta, Indonesia, Manila, Philippines, Kuala Lumpur, Malaysia, Taipei, Taiwan, and other key Asia-Pacific metropolitan areas.

Available Now: 53.0 MW across 1 sites

Largest Single Block: 53.0 MW

Near-term Future Planned Capacity (2Q2026-2Q2028): 0.0 MW

Build Upon Request: 0.0 MW

Typical Build Timeline: 18 months (range: 12-36 months)

Total Future Planned Capacity: 0.0 MW

Cooling: 1 sites with hybrid (liquid and air) cooling

Europe - Eastern covers Eastern European markets including: Warsaw, Poland, Prague, Czech Republic, Budapest, Hungary, Bucharest, Romania, Sofia, Bulgaria, Zagreb, Croatia, Ljubljana, Slovenia, Bratislava, Slovakia, Vilnius, Lithuania, Riga, Latvia, Tallinn, Estonia, and emerging data center markets across Eastern Europe.

Available Now: 144.3 MW across 30 sites

Largest Single Block: 40.0 MW

Near-term Future Planned Capacity (2Q2026-2Q2028): 3,539.6 MW

Build Upon Request: 79.3 MW

Typical Build Timeline: 12 months (range: 2-18 months)

Total Future Planned Capacity: 6,135.6 MW

Cooling: 2 sites with liquid cooling, 18 sites with hybrid (liquid and air) cooling

Europe - Western includes major Western European data center hubs: London, United Kingdom, Frankfurt, Germany, Amsterdam, Netherlands, Paris, France, Dublin, Ireland, Zurich, Switzerland, Geneva, Switzerland, Madrid, Spain, Barcelona, Spain, Milan, Italy, Brussels, Belgium, Vienna, Austria, Luxembourg City, Luxembourg, and surrounding metropolitan areas across Western Europe.

Available Now: 216.1 MW across 13 sites

Largest Single Block: 100.0 MW

Near-term Future Planned Capacity (2Q2026-2Q2028): 1,428.2 MW

Build Upon Request: 518.0 MW

Typical Build Timeline: 15 months (range: 9-24 months)

Total Future Planned Capacity: 2,273.7 MW

Cooling: 8 sites with hybrid (liquid and air) cooling

Europe - Nordic encompasses Nordic data center markets: Stockholm, Sweden, Copenhagen, Denmark, Oslo, Norway, Helsinki, Finland, Reykjavik, Iceland, Gothenburg, Sweden, Malmö, Sweden, Aarhus, Denmark, Bergen, Norway, Trondheim, Norway, Tampere, Finland, Turku, Finland, and other major Nordic cities known for sustainable data center operations.

US - East: ✓ Yes (largest block: 52.0 MW)
US - Central: ✓ Yes (largest block: 20.0 MW)
US - West: ✓ Yes (largest block: 22.0 MW)
North America: ✓ Yes (largest block: 4.0 MW)
Latin America: ✓ Yes (largest block: 15.0 MW)

Liquid cooling availability by region:
US - East: 8 liquid-only sites, 25 hybrid (liquid and air) sites
US - Central: 5 liquid-only sites, 28 hybrid (liquid and air) sites
US - West: 5 liquid-only sites, 9 hybrid (liquid and air) sites
North America: 1 liquid-only sites, 1 hybrid (liquid and air) sites
Latin America: 2 hybrid (liquid and air) sites
Africa - Sub Saharan: 4 hybrid (liquid and air) sites
Africa - North: 1 hybrid (liquid and air) sites
Oceania: 1 hybrid (liquid and air) sites
Asia: 1 liquid-only sites, 19 hybrid (liquid and air) sites
Europe - Eastern: 1 hybrid (liquid and air) sites
Europe - Western: 2 liquid-only sites, 18 hybrid (liquid and air) sites
Europe - Nordic: 8 hybrid (liquid and air) sites

Liquid cooling is essential for GPU clusters and AI training workloads requiring >45kW per rack.

Wholesale Data Center Capacity
Site Name City Region Available MW Future MW Available Quarter Build Upon Request MW
Fluffy Fortress Chucklesberg, TX Europe - Western None Available 5.0 MW 1Q2026 5.0 MW (12 Mo)
Cosmic Computing Gigglewood, CA Asia 37.00 MW 150.0 MW 2Q2026 150.0 MW (18 Mo)
Laughing Labs Snortville, NY US - East None Available 24.0 MW 2Q2026 -
Dancing Datacenter Belly Laugh, FL US - East None Available 10.0 MW 2Q2026 20.0 MW (24 Mo)
Silly Systems Tickletown, IL North America None Available 28.0 MW 3Q2026 72.0 MW (18 Mo)
Tickled Technologies Guffaw Gardens, WA US - West None Available 9.0 MW
9.0 MW
9.0 MW
9.0 MW
18.0 MW
4Q2026
1Q2027
2Q2027
4Q2027
3Q2026
-
Banana Holdings Chortle Creek, OR US - East 1.00 MW 3.0 MW 3Q2026 4.0 MW (18 Mo)
Snuggle Server Farm Snicker Springs, CO Asia None Available 100.0 MW 4Q2026 -
Disco Digital Haha Heights, NV Asia None Available 24.0 MW 4Q2026 -
Rubber Resources Chuckle Valley, AZ US - Central 0.90 MW 15.0 MW 2Q2027 -
Giggly Grid Giggle Grove, GA Asia 2.00 MW 3.0 MW 3Q2031 4.0 MW (36 Mo)
Noodle Networks Smirk City, MI Africa - Sub Saharan 3.00 MW None Planned - -
Fuzzy Processing Titter Town, OH Africa - North 2.00 MW None Planned - -
Goblin Web Services Cackle Corners, PA US - West 3.00 MW None Planned - -
Chuckling Cloud Snort Station, NC US - Central 0.50 MW None Planned - 3.0 MW (18 Mo)
Tickle Technologies Wheeze Wilds, TN US - East 1.50 MW None Planned - -
Bubble Bandwidth Chuckle Canyon, UT US - East 1.00 MW None Planned - -
Giggly Infrastructure Giggle Gulch, ID US - East 4.00 MW None Planned - -
Silly String Storage Laugh Lake, MN US - East 3.00 MW None Planned - -
Mystery Megacenter Comedy Central, KS US - West 4.00 MW 3.00 MW - -
Fluffy Fortress Chucklesberg, TX US - Central 2.00 MW None Planned - -
Cosmic Computing Gigglewood, CA US - East 1.00 MW None Planned - -
Laughing Labs Snortville, NY US - East 1.00 MW None Planned - -
Dancing Datacenter Belly Laugh, FL US - East 4.00 MW None Planned - -
Silly Systems Tickletown, IL Asia 10.00 MW None Planned - -
Tickled Technologies Guffaw Gardens, WA US - West 2.00 MW None Planned - 6.0 MW (24 Mo)
Banana Holdings Chortle Creek, OR Europe - Nordic 4.00 MW None Planned - -
Snuggle Server Farm Snicker Springs, CO US - Central 0.30 MW None Planned - 1.0 MW (18 Mo)
Disco Digital Haha Heights, NV US - Central 0.20 MW None Planned - -
Rubber Resources Chuckle Valley, AZ US - East 7.00 MW None Planned - -
Giggly Grid Giggle Grove, GA Europe - Western 4.00 MW None Planned - -
Noodle Networks Smirk City, MI Africa - Sub Saharan 7.00 MW None Planned - -
Fuzzy Processing Titter Town, OH Europe - Western None Available 36.0 MW 2Q2027 -
Goblin Web Services Cackle Corners, PA Europe - Nordic 10.00 MW None Planned - -
Chuckling Cloud Snort Station, NC US - East 1.00 MW None Planned - -
Tickle Technologies Wheeze Wilds, TN US - Central 0.50 MW None Planned - -
Bubble Bandwidth Chuckle Canyon, UT US - East 4.00 MW None Planned - -
Giggly Infrastructure Giggle Gulch, ID US - East 2.00 MW None Planned - -
Silly String Storage Laugh Lake, MN Asia 4.00 MW None Planned - -
Mystery Megacenter Comedy Central, KS US - Central 2.20 MW None Planned - 8.0 MW (24 Mo)
Fluffy Fortress Chucklesberg, TX US - West None Available 40.00 MW - -
Cosmic Computing Gigglewood, CA Europe - Western 3.00 MW None Planned - -
Laughing Labs Snortville, NY US - West None Available 6.0 MW 1Q2027 10.0 MW (18 Mo)
Dancing Datacenter Belly Laugh, FL Oceania 1.00 MW None Planned - -
Silly Systems Tickletown, IL US - Central 5.00 MW None Planned - -
Tickled Technologies Guffaw Gardens, WA US - East 2.00 MW None Planned - -
Banana Holdings Chortle Creek, OR US - East 1.00 MW None Planned - -
Snuggle Server Farm Snicker Springs, CO Oceania 1.20 MW None Planned - -
Disco Digital Haha Heights, NV US - Central None Available None Planned - 4.0 MW (6 Mo)
Rubber Resources Chuckle Valley, AZ US - East 1.00 MW None Planned - -
Giggly Grid Giggle Grove, GA US - East None Available 60.0 MW 2Q2027 -
Noodle Networks Smirk City, MI Asia None Available None Planned - 72.0 MW (18 Mo)
Fuzzy Processing Titter Town, OH Asia None Available None Planned - 15.0 MW (6 Mo)
Goblin Web Services Cackle Corners, PA Asia None Available None Planned - 100.0 MW (18 Mo)
Chuckling Cloud Snort Station, NC Asia None Available None Planned - 200.0 MW (18 Mo)
Tickle Technologies Wheeze Wilds, TN Asia None Available None Planned - 100.0 MW (18 Mo)
Bubble Bandwidth Chuckle Canyon, UT Europe - Western 1.00 MW None Planned - -
Giggly Infrastructure Giggle Gulch, ID US - Central 0.20 MW None Planned - 2.0 MW (18 Mo)
Silly String Storage Laugh Lake, MN US - East 1.00 MW None Planned - -
Mystery Megacenter Comedy Central, KS Asia 76.00 MW None Planned - 100.0 MW (18 Mo)
Fluffy Fortress Chucklesberg, TX US - West 6.00 MW None Planned - -
Cosmic Computing Gigglewood, CA US - West 1.00 MW None Planned - -
Laughing Labs Snortville, NY US - East 1.00 MW None Planned - -
Dancing Datacenter Belly Laugh, FL US - Central 0.80 MW None Planned - -
Silly Systems Tickletown, IL US - Central None Available None Planned - -
Tickled Technologies Guffaw Gardens, WA US - West 12.00 MW None Planned - -
Banana Holdings Chortle Creek, OR US - West 11.40 MW None Planned - -
Snuggle Server Farm Snicker Springs, CO US - West 22.00 MW None Planned - -
Disco Digital Haha Heights, NV US - East 4.00 MW None Planned - -
Rubber Resources Chuckle Valley, AZ US - East 4.00 MW None Planned - -
Giggly Grid Giggle Grove, GA US - Central 2.50 MW None Planned - -
Noodle Networks Smirk City, MI US - Central 5.00 MW None Planned - -
Fuzzy Processing Titter Town, OH US - West 12.20 MW None Planned - -
Goblin Web Services Cackle Corners, PA US - Central 5.00 MW None Planned - -
Chuckling Cloud Snort Station, NC US - West 5.80 MW None Planned - -
Tickle Technologies Wheeze Wilds, TN US - East 2.30 MW None Planned - -
Bubble Bandwidth Chuckle Canyon, UT US - East 1.60 MW None Planned - -
Giggly Infrastructure Giggle Gulch, ID Europe - Western 4.60 MW None Planned - -
Silly String Storage Laugh Lake, MN Europe - Nordic 16.00 MW None Planned - 100 MW (9 Mo)
Mystery Megacenter Comedy Central, KS US - Central 2.00 MW None Planned - -
Fluffy Fortress Chucklesberg, TX US - West 2.40 MW None Planned - -
Cosmic Computing Gigglewood, CA US - Central 4.00 MW None Planned - -
Laughing Labs Snortville, NY Asia 9.00 MW None Planned - 48.0 MW (18 Mo)
Dancing Datacenter Belly Laugh, FL US - East 0.30 MW None Planned - -
Silly Systems Tickletown, IL US - Central 0.30 MW None Planned - -
Tickled Technologies Guffaw Gardens, WA US - Central 0.08 MW None Planned - -
Banana Holdings Chortle Creek, OR US - Central 0.17 MW None Planned - -
Snuggle Server Farm Snicker Springs, CO US - East 0.30 MW 0.40 MW - -
Disco Digital Haha Heights, NV US - East 0.10 MW None Planned - -
Rubber Resources Chuckle Valley, AZ US - East 0.90 MW None Planned - -
Giggly Grid Giggle Grove, GA Europe - Western 6.00 MW None Planned - -
Noodle Networks Smirk City, MI US - East None Available None Planned - -
Fuzzy Processing Titter Town, OH US - Central 0.90 MW None Planned - -
Goblin Web Services Cackle Corners, PA US - Central 0.30 MW None Planned - -
Chuckling Cloud Snort Station, NC US - Central 0.30 MW None Planned - 30.00 MW
Tickle Technologies Wheeze Wilds, TN US - Central 0.30 MW None Planned - -
Bubble Bandwidth Chuckle Canyon, UT US - Central 0.07 MW None Planned - -
Giggly Infrastructure Giggle Gulch, ID US - Central 0.10 MW None Planned - -
Silly String Storage Laugh Lake, MN US - Central 0.50 MW None Planned - 2.40 MW
Mystery Megacenter Comedy Central, KS US - West 1.00 MW None Planned - 4.00 MW
Fluffy Fortress Chucklesberg, TX US - East 0.30 MW 0.50 MW - -
Cosmic Computing Gigglewood, CA US - East 0.15 MW None Planned - 0.75 MW (12 Mo)
Laughing Labs Snortville, NY US - Central 0.13 MW None Planned - -
Dancing Datacenter Belly Laugh, FL US - East None Available None Planned - -
Silly Systems Tickletown, IL US - East 0.40 MW None Planned - -
Tickled Technologies Guffaw Gardens, WA Europe - Western None Available 10 MW 1Q2027 -
Banana Holdings Chortle Creek, OR US - West 0.30 MW None Planned - 2.00 MW
Snuggle Server Farm Snicker Springs, CO US - Central None Available None Planned - 8.0 MW (18 Mo)
Disco Digital Haha Heights, NV US - East 0.15 MW None Planned - -
Rubber Resources Chuckle Valley, AZ US - Central None Available None Planned - 250.0 MW (24 Mo)
Giggly Grid Giggle Grove, GA US - East None Available None Planned - -
Noodle Networks Smirk City, MI Europe - Nordic 3.60 MW None Planned - -
Fuzzy Processing Titter Town, OH US - Central 5.00 MW None Planned - -
Goblin Web Services Cackle Corners, PA US - Central None Available None Planned - -
Chuckling Cloud Snort Station, NC US - Central None Available None Planned - -
Tickle Technologies Wheeze Wilds, TN US - Central None Available None Planned - -
Bubble Bandwidth Chuckle Canyon, UT Asia 5.00 MW None Planned - -
Giggly Infrastructure Giggle Gulch, ID US - East None Available None Planned - -
Silly String Storage Laugh Lake, MN US - East 1.40 MW None Planned - 1.4 MW (12 Mo)
Mystery Megacenter Comedy Central, KS US - East None Available None Planned - -
Fluffy Fortress Chucklesberg, TX US - East 0.31 MW None Planned - -
Cosmic Computing Gigglewood, CA US - Central None Available 9.5 MW 3Q2027 54.5 MW (18 Mo)
Laughing Labs Snortville, NY US - East None Available 30.4 MW 1Q2028 -
Dancing Datacenter Belly Laugh, FL US - East None Available 100.0 MW 1Q2027 -
Silly Systems Tickletown, IL Europe - Western None Available 10 MW 1Q2027 -
Tickled Technologies Guffaw Gardens, WA US - Central 0.60 MW None Planned - -
Banana Holdings Chortle Creek, OR US - East None Available 15.5 MW 2Q2026 -
Snuggle Server Farm Snicker Springs, CO US - West 3.88 MW None Planned - -
Disco Digital Haha Heights, NV Europe - Nordic 100.00 MW None Planned - 250 MW (15 Mo)
Rubber Resources Chuckle Valley, AZ US - Central 0.35 MW None Planned - -
Giggly Grid Giggle Grove, GA US - East None Available None Planned - -
Noodle Networks Smirk City, MI US - East None Available 216.0 MW 1Q2028 -
Fuzzy Processing Titter Town, OH US - Central 6.20 MW None Planned - -
Goblin Web Services Cackle Corners, PA US - Central 0.50 MW None Planned - 1.0 MW (24 Mo)
Chuckling Cloud Snort Station, NC Europe - Western None Available 12.0 MW
12.0 MW
3Q2026
4Q2026
-
Tickle Technologies Wheeze Wilds, TN US - East None Available 672.0 MW 1Q2028 -
Bubble Bandwidth Chuckle Canyon, UT US - West None Available 24 MW 2028 -
Giggly Infrastructure Giggle Gulch, ID US - East None Available 480.0 MW 2Q2028 -
Silly String Storage Laugh Lake, MN US - West None Available 5 MW 3Q2026 -
Mystery Megacenter Comedy Central, KS US - Central 3.03 MW None Planned - -
Fluffy Fortress Chucklesberg, TX US - East 3.68 MW None Planned - -
Cosmic Computing Gigglewood, CA US - East None Available 216.0 MW 1Q2028 -
Laughing Labs Snortville, NY US - East None Available 360.0 MW 3Q2027 -
Dancing Datacenter Belly Laugh, FL US - Central None Available 360.0 MW 3Q2027 -
Silly Systems Tickletown, IL US - East None Available 500.0 MW 1Q2027 -
Tickled Technologies Guffaw Gardens, WA US - East None Available 360.0 MW 1Q2028 -
Banana Holdings Chortle Creek, OR US - East None Available 216.0 MW 1Q2028 -
Snuggle Server Farm Snicker Springs, CO US - East None Available 288.0 MW 1Q2028 -
Disco Digital Haha Heights, NV US - West None Available 216.0 MW 1Q2028 -
Rubber Resources Chuckle Valley, AZ US - Central 1.40 MW 3.6 MW
10 MW

2027
-
Giggly Grid Giggle Grove, GA US - Central None Available 344.0 MW 2Q2027 -
Noodle Networks Smirk City, MI US - Central None Available 432.0 MW 1Q2029 -
Fuzzy Processing Titter Town, OH US - Central 0.51 MW None Planned - -
Goblin Web Services Cackle Corners, PA US - East 2.60 MW None Planned - -
Chuckling Cloud Snort Station, NC Europe - Western 4.00 MW 36.0 MW 1Q2028 -
Tickle Technologies Wheeze Wilds, TN Europe - Western 8.00 MW 47.0 MW 1Q2029 -
Bubble Bandwidth Chuckle Canyon, UT Asia 25.00 MW None Planned - -
Giggly Infrastructure Giggle Gulch, ID Asia 0.50 MW 24.0 MW 1Q2028 -
Silly String Storage Laugh Lake, MN Asia None Available None Planned - -
Mystery Megacenter Comedy Central, KS Asia None Available 100.0 MW 3Q2026 -
Fluffy Fortress Chucklesberg, TX Europe - Western 1.00 MW 24.0 MW 1Q2028 -
Cosmic Computing Gigglewood, CA Europe - Western 14.00 MW 6.0 MW
36.0 MW
1Q2026
1Q2028
-
Laughing Labs Snortville, NY Europe - Western 12.00 MW 4.0 MW
8.0 MW
95.0 MW
1Q2026
3Q2026
1Q2027
-
Dancing Datacenter Belly Laugh, FL US - East 1.10 MW None Planned - -
Silly Systems Tickletown, IL US - East 52.00 MW 20.0 MW
900.0 MW
3Q2026
4Q2027
-
Tickled Technologies Guffaw Gardens, WA US - Central None Available 9.5 MW
64 MW
3Q2027
2Q2029
-
Banana Holdings Chortle Creek, OR US - Central None Available 9.5 MW
48 MW
3Q2027
1Q2029
-
Snuggle Server Farm Snicker Springs, CO Africa - Sub Saharan None Available 22 MW 3Q2026 -
Disco Digital Haha Heights, NV Africa - Sub Saharan None Available 24 MW 4Q2026 -
Rubber Resources Chuckle Valley, AZ US - East 0.50 MW None Planned - -
Giggly Grid Giggle Grove, GA US - East 50.00 MW 400.0 MW
1200.0 MW
4Q2026
4Q2027
-
Noodle Networks Smirk City, MI US - West None Available 6 MW
16 MW
1Q2027
4Q2027
-
Fuzzy Processing Titter Town, OH US - East 0.16 MW None Planned - 0.4 MW (6 Mo)
Goblin Web Services Cackle Corners, PA US - East None Available 30.4 MW
68.4 MW
1Q2028
1Q2028
-
Chuckling Cloud Snort Station, NC US - East None Available None Planned - 15.2 MW (12 Mo)
Tickle Technologies Wheeze Wilds, TN US - Central None Available 9.5 MW
76 MW
1Q2028
1Q2028
-
Bubble Bandwidth Chuckle Canyon, UT US - Central None Available 11.4 MW
57 MW
3Q2027
3Q2029
-
Giggly Infrastructure Giggle Gulch, ID US - West 4.28 MW None Planned - -
Silly String Storage Laugh Lake, MN US - West None Available 3.6 MW 1Q2027 -
Mystery Megacenter Comedy Central, KS US - East None Available 11.4 MW 3Q2027 45.6 MW (18 Mo)
Fluffy Fortress Chucklesberg, TX Africa - Sub Saharan None Available 5.28 MW 4Q2026 -
Cosmic Computing Gigglewood, CA Africa - Sub Saharan None Available 4.2 MW 1Q2027 -
Laughing Labs Snortville, NY US - Central None Available 12.5 MW
12.5 MW
4Q2026
1Q2027
-
Dancing Datacenter Belly Laugh, FL Africa - Sub Saharan None Available 2 MW 1Q2027 -
Silly Systems Tickletown, IL Africa - Sub Saharan None Available 30 MW 1Q2028 -
Tickled Technologies Guffaw Gardens, WA Africa - Sub Saharan None Available 30 MW 1Q2028 -
Banana Holdings Chortle Creek, OR Europe - Western 0.70 MW None Planned - 2 MW (6 Mo)
12 MW (9 Mo)
Snuggle Server Farm Snicker Springs, CO US - Central None Available 9.5 MW 1Q2028 66.5 MW (18 Mo)
Disco Digital Haha Heights, NV Europe - Western None Available None Planned - 0.3 MW (2 Mo)
Rubber Resources Chuckle Valley, AZ US - Central None Available None Planned - 20.0 MW (12 Mo)
40.0 MW (12 Mo)
Giggly Grid Giggle Grove, GA Europe - Western None Available None Planned - 22 MW (13 Mo)
Noodle Networks Smirk City, MI US - West 1.00 MW None Planned - -
Fuzzy Processing Titter Town, OH US - Central 1.20 MW None Planned - 1.2 MW (4 Mo)
Goblin Web Services Cackle Corners, PA Europe - Western None Available 480 MW 4Q2029 -
Chuckling Cloud Snort Station, NC US - Central 20.00 MW 40.0 MW 4Q2027 -
Tickle Technologies Wheeze Wilds, TN Europe - Western 21.00 MW 3.0 MW 1Q2026 -
Bubble Bandwidth Chuckle Canyon, UT Europe - Nordic None Available 6.0 MW 2Q2026 60.0 MW (18 Mo)
Giggly Infrastructure Giggle Gulch, ID Europe - Nordic 1.00 MW None Planned - -
Silly String Storage Laugh Lake, MN Europe - Nordic None Available 8.0 MW
16.0 MW
4Q2026
1Q2027
-
Mystery Megacenter Comedy Central, KS Europe - Nordic 33.60 MW 33.6 MW
180.0 MW
430.0 MW
2Q2026
3Q2026
3Q2027
-
Fluffy Fortress Chucklesberg, TX US - Central 1.50 MW None Planned - -
Cosmic Computing Gigglewood, CA US - East None Available None Planned - 3.0 MW (12 Mo)
Laughing Labs Snortville, NY US - Central None Available 18.0 MW 4Q2026 -
Dancing Datacenter Belly Laugh, FL US - Central None Available None Planned - -
Silly Systems Tickletown, IL US - Central None Available 30.0 MW 1Q2027 -
Tickled Technologies Guffaw Gardens, WA US - Central None Available 18.0 MW 1Q2027 -
Banana Holdings Chortle Creek, OR US - East 1.40 MW 3.0 MW 2Q2026 -
Snuggle Server Farm Snicker Springs, CO US - West 3.00 MW None Planned - -
Disco Digital Haha Heights, NV North America 4.00 MW None Planned - -
Rubber Resources Chuckle Valley, AZ North America 4.00 MW None Planned - -
Giggly Grid Giggle Grove, GA North America None Available 8.0 MW 3Q2027 -
Noodle Networks Smirk City, MI Europe - Western None Available None Planned - -
Fuzzy Processing Titter Town, OH Europe - Nordic None Available None Planned - -
Goblin Web Services Cackle Corners, PA US - West None Available 48.0 MW 2Q2026 -
Chuckling Cloud Snort Station, NC US - West None Available 48.0 MW 2Q2026 -
Tickle Technologies Wheeze Wilds, TN US - West None Available 12.0 MW
36.0 MW
2Q2026
2Q2027
-
Bubble Bandwidth Chuckle Canyon, UT US - West None Available 48.0 MW 2Q2028 -
Giggly Infrastructure Giggle Gulch, ID US - West None Available 9.0 MW 2Q2026 -
Silly String Storage Laugh Lake, MN US - West None Available 9.0 MW 2Q2026 -
Mystery Megacenter Comedy Central, KS US - West 20.00 MW None Planned - -
Fluffy Fortress Chucklesberg, TX US - West None Available 6.0 MW
12.0 MW
2Q2026
2Q2027
-
Cosmic Computing Gigglewood, CA US - Central None Available 96.0 MW
144.0 MW
96.0 MW
2Q2027
2Q2028
2Q2029
-
Laughing Labs Snortville, NY US - Central None Available 96.0 MW
48.0 MW
2Q2027
2Q2028
-
Dancing Datacenter Belly Laugh, FL US - Central None Available 33.0 MW 2Q2027 -
Silly Systems Tickletown, IL US - Central None Available 18.0 MW
36.0 MW
2Q2026
2Q2027
-
Tickled Technologies Guffaw Gardens, WA US - East None Available 4.0 MW 3Q2026 -
Banana Holdings Chortle Creek, OR Europe - Western None Available 20.0 MW
112.0 MW
30.0 MW
30.0 MW
2Q2027
2Q2028
2Q2028
2Q2029
-
Snuggle Server Farm Snicker Springs, CO Europe - Western None Available 20.0 MW
20.0 MW
2Q2027
2Q2028
-
Disco Digital Haha Heights, NV Europe - Western None Available 10.0 MW
10.0 MW
2Q2026
2Q2027
-
Rubber Resources Chuckle Valley, AZ Europe - Western None Available 30.0 MW
90.0 MW
2Q2028
2Q2030
-
Giggly Grid Giggle Grove, GA Europe - Western None Available 40.0 MW
20.0 MW
120.0 MW
2Q2028
2Q2029
2Q2030
-
Noodle Networks Smirk City, MI Europe - Nordic None Available 40.0 MW 2Q2027 -
Fuzzy Processing Titter Town, OH Europe - Nordic None Available 30.0 MW
60.0 MW
2Q2027
2Q2028
-
Goblin Web Services Cackle Corners, PA Europe - Western None Available 30.0 MW
30.0 MW
2Q2027
2Q2029
-
Chuckling Cloud Snort Station, NC Europe - Western None Available 30.0 MW
60.0 MW
90.0 MW
2Q2027
2Q2028
2Q2029
-
Tickle Technologies Wheeze Wilds, TN Europe - Western None Available 30.0 MW
30.0 MW
2Q2027
2Q2029
-
Bubble Bandwidth Chuckle Canyon, UT Europe - Western None Available 60.0 MW
80.0 MW
2Q2028
2Q2029
-
Giggly Infrastructure Giggle Gulch, ID Europe - Western None Available 30.0 MW
30.0 MW
2Q2027
2Q2028
-
Silly String Storage Laugh Lake, MN US - Central 5.20 MW None Planned - -
Mystery Megacenter Comedy Central, KS US - Central 3.50 MW None Planned - -
Fluffy Fortress Chucklesberg, TX US - Central None Available 64.0 MW 2Q2027 -
Cosmic Computing Gigglewood, CA Europe - Nordic 20.00 MW None Planned - 100 MW (24 Mo)
Laughing Labs Snortville, NY US - West None Available 48 MW 4Q2026 -
Dancing Datacenter Belly Laugh, FL US - West None Available 96 MW 4Q2028 -
Silly Systems Tickletown, IL US - East None Available 96 MW 1Q2027 -
Tickled Technologies Guffaw Gardens, WA US - Central None Available 400 MW 4Q2027 -
Banana Holdings Chortle Creek, OR US - Central None Available 896 MW 4Q2027 -
Snuggle Server Farm Snicker Springs, CO US - Central None Available 1000 MW 4Q2027 -
Disco Digital Haha Heights, NV Asia 56.00 MW None Planned - -
Rubber Resources Chuckle Valley, AZ US - East None Available 192 MW 4Q2027 -
Giggly Grid Giggle Grove, GA Europe - Western None Available 144 MW 4Q2027 -
Noodle Networks Smirk City, MI Africa - Sub Saharan None Available 32 MW 4Q2027 -
Fuzzy Processing Titter Town, OH Europe - Western None Available 20 MW 4Q2026 -
Goblin Web Services Cackle Corners, PA US - Central 1.00 MW None Planned - 1 MW (18 Mo)
Chuckling Cloud Snort Station, NC US - Central 0.60 MW None Planned - -
Tickle Technologies Wheeze Wilds, TN Africa - Sub Saharan 4.00 MW 64.0 MW 1Q2026 -
Bubble Bandwidth Chuckle Canyon, UT Europe - Eastern 53.00 MW None Planned - -
Giggly Infrastructure Giggle Gulch, ID Asia 16.00 MW None Planned - -
Silly String Storage Laugh Lake, MN US - East 0.50 MW None Planned - -
Mystery Megacenter Comedy Central, KS US - West None Available 1.2 MW 2Q2026 -
Fluffy Fortress Chucklesberg, TX US - Central None Available 2.7 MW 1Q2027 -
Cosmic Computing Gigglewood, CA US - Central None Available None Planned - 4.00 MW (12 Mo)
Laughing Labs Snortville, NY North America None Available None Planned - 8.00 MW (12 Mo)
Dancing Datacenter Belly Laugh, FL US - East None Available None Planned - 4.00 MW (12 Mo)
Silly Systems Tickletown, IL US - East None Available None Planned - 5.00 MW (12 Mo)
Tickled Technologies Guffaw Gardens, WA US - Central None Available 20.00 MW 4Q2026 -
Banana Holdings Chortle Creek, OR US - Central None Available 2.00 MW 4Q2026 -
Snuggle Server Farm Snicker Springs, CO US - East 0.35 MW None Planned - -
Disco Digital Haha Heights, NV US - East 0.19 MW None Planned - -
Rubber Resources Chuckle Valley, AZ US - East 0.25 MW None Planned - -
Giggly Grid Giggle Grove, GA US - East 0.49 MW None Planned - -
Noodle Networks Smirk City, MI US - Central 0.40 MW None Planned - -
Fuzzy Processing Titter Town, OH US - East 0.33 MW None Planned - -
Goblin Web Services Cackle Corners, PA US - Central 0.23 MW None Planned - -
Chuckling Cloud Snort Station, NC US - East 0.52 MW None Planned - -
Tickle Technologies Wheeze Wilds, TN US - East 0.31 MW None Planned - -
Bubble Bandwidth Chuckle Canyon, UT US - East 0.70 MW None Planned - -
Giggly Infrastructure Giggle Gulch, ID US - East 6.80 MW None Planned - -
Silly String Storage Laugh Lake, MN US - East 4.36 MW None Planned - -
Mystery Megacenter Comedy Central, KS US - East 1.05 MW None Planned - -
Fluffy Fortress Chucklesberg, TX US - East 1.60 MW None Planned - -
Cosmic Computing Gigglewood, CA US - East 1.39 MW None Planned - -
Laughing Labs Snortville, NY US - West 0.20 MW None Planned - -
Dancing Datacenter Belly Laugh, FL US - Central 1.00 MW None Planned - -
Silly Systems Tickletown, IL Asia 7.00 MW None Planned - -
Tickled Technologies Guffaw Gardens, WA Europe - Western None Available None Planned - -
Banana Holdings Chortle Creek, OR Asia 3.00 MW 6.0 MW 1Q2026 -
Snuggle Server Farm Snicker Springs, CO Europe - Western None Available None Planned - -
Disco Digital Haha Heights, NV Europe - Nordic None Available None Planned - -
Rubber Resources Chuckle Valley, AZ Europe - Nordic None Available 60.0 MW
60.0 MW
60.0 MW
2Q2027
2Q2028
2Q2029
-
Giggly Grid Giggle Grove, GA Europe - Western None Available 20.0 MW
10.0 MW
2Q2026
2Q2027
-
Noodle Networks Smirk City, MI US - Central None Available 18.0 MW
36.0 MW
2Q2026
2Q2027
-
Fuzzy Processing Titter Town, OH US - East 1.00 MW None Planned - 5.0 MW (24 Mo)
Goblin Web Services Cackle Corners, PA US - Central 2.50 MW None Planned - -
Chuckling Cloud Snort Station, NC US - Central 1.50 MW None Planned - -
Tickle Technologies Wheeze Wilds, TN US - Central None Available 3 MW 3Q2026 -
Bubble Bandwidth Chuckle Canyon, UT US - Central None Available 6 MW 3Q2026 -
Giggly Infrastructure Giggle Gulch, ID Latin America 0.80 MW None Planned - -
Silly String Storage Laugh Lake, MN US - East 1.40 MW 1.0 MW 4Q2026 -
Mystery Megacenter Comedy Central, KS US - East 0.50 MW None Planned - -
Fluffy Fortress Chucklesberg, TX Europe - Nordic None Available 24.0 MW
24.0 MW
24.0 MW
24.0 MW
24.0 MW
24.0 MW
4Q2027
1Q2028
2Q2028
2Q2028
3Q2028
3Q2028
-
Cosmic Computing Gigglewood, CA US - West 0.35 MW 1.0 MW 4Q2026 -
Laughing Labs Snortville, NY US - West 0.20 MW None Planned - -
Dancing Datacenter Belly Laugh, FL US - Central 0.05 MW None Planned - -
Silly Systems Tickletown, IL US - Central None Available None Planned - -
Tickled Technologies Guffaw Gardens, WA US - East 2.00 MW None Planned - 6.0 MW (18 Mo)
Banana Holdings Chortle Creek, OR US - East None Available None Planned - 4.0 MW (12 Mo)
4.0 MW (18 Mo)
Snuggle Server Farm Snicker Springs, CO US - East None Available 17.0 MW 4Q2026 -
Disco Digital Haha Heights, NV US - Central None Available None Planned - 4.0 MW (12 Mo)
4.0 MW (18 Mo)
Rubber Resources Chuckle Valley, AZ US - Central 4.00 MW None Planned - 4.0 MW (18 Mo)
Giggly Grid Giggle Grove, GA US - West 2.00 MW None Planned - 6.0 MW (24 Mo)
Noodle Networks Smirk City, MI US - Central 8.00 MW None Planned - -
Fuzzy Processing Titter Town, OH US - Central None Available None Planned - 4.0 MW (12 Mo)
4.0 MW (18 Mo)
Goblin Web Services Cackle Corners, PA US - East 12.00 MW None Planned - 8.0 MW (18 Mo)
Chuckling Cloud Snort Station, NC US - Central None Available None Planned - 4.0 MW (12 Mo)
4.0 MW (18 Mo)
Tickle Technologies Wheeze Wilds, TN US - Central 2.00 MW None Planned - 4.0 MW (12 Mo)
Bubble Bandwidth Chuckle Canyon, UT US - West None Available 96.0 MW 4Q2028 -
Giggly Infrastructure Giggle Gulch, ID Asia 6.00 MW None Planned - -
Silly String Storage Laugh Lake, MN US - East None Available None Planned - 15.2 MW (12 Mo)
Mystery Megacenter Comedy Central, KS US - East 2.16 MW None Planned - -
Fluffy Fortress Chucklesberg, TX US - East 3.00 MW 1.0 MW 2Q2026 5.0 MW (12 Mo)
Cosmic Computing Gigglewood, CA US - East None Available 3 MW 2026 -
Laughing Labs Snortville, NY Latin America None Available 30 MW
30 MW
4Q2026
4Q2027
-
Dancing Datacenter Belly Laugh, FL US - West 2.00 MW None Planned - -
Silly Systems Tickletown, IL US - Central None Available 2.0 MW
2.0 MW
2.0 MW
2Q2026
2Q2027
4Q2027
-
Tickled Technologies Guffaw Gardens, WA Latin America 15.00 MW 17 MW
25 MW
25 MW
4Q2026
4Q2026
4Q2027
-
Banana Holdings Chortle Creek, OR Latin America None Available 35 MW
40 MW
45 MW
4Q2027
4Q2028
4Q2029
-
Snuggle Server Farm Snicker Springs, CO Latin America 0.50 MW 3 MW 4Q2026 -
Disco Digital Haha Heights, NV US - West None Available 6.0 MW 2Q2027 -
Rubber Resources Chuckle Valley, AZ US - East 1.30 MW None Planned - -
Giggly Grid Giggle Grove, GA US - East 2.20 MW None Planned - -
Noodle Networks Smirk City, MI US - East 1.50 MW None Planned - -
Fuzzy Processing Titter Town, OH Latin America 5.40 MW None Planned - -
Goblin Web Services Cackle Corners, PA Latin America 0.50 MW None Planned - -
Chuckling Cloud Snort Station, NC US - Central None Available None Planned - -
Tickle Technologies Wheeze Wilds, TN Latin America 1.00 MW 3 MW 4Q2026 -
Bubble Bandwidth Chuckle Canyon, UT Europe - Western None Available 5.5 MW 1Q2027 -
Giggly Infrastructure Giggle Gulch, ID US - Central None Available 13.5 MW
4.5 MW
4.5 MW
2Q2027
3Q2027
4Q2027
-
Silly String Storage Laugh Lake, MN US - Central 0.97 MW None Planned - -
Mystery Megacenter Comedy Central, KS US - Central 0.60 MW None Planned - -
Fluffy Fortress Chucklesberg, TX US - East None Available 9.0 MW
9.0 MW
4.5 MW
4.5 MW
4.5 MW
4.5 MW
3Q2026
4Q2026
1Q2027
2Q2027
3Q2027
4Q2027
-
Cosmic Computing Gigglewood, CA US - East None Available None Planned - -
Laughing Labs Snortville, NY Europe - Western 1.20 MW 3.6 MW 2Q2026 -
Dancing Datacenter Belly Laugh, FL Europe - Western 0.10 MW 0.6 MW 4Q2026 -
Silly Systems Tickletown, IL Europe - Western 0.20 MW 9.0 MW 4Q2028 -
Tickled Technologies Guffaw Gardens, WA Asia 5.00 MW None Planned - -
Banana Holdings Chortle Creek, OR Asia 0.60 MW None Planned - -
Snuggle Server Farm Snicker Springs, CO Asia None Available 100.0 MW 4Q2028 -
Disco Digital Haha Heights, NV None Available 40.0 MW
60.0 MW
50.0 MW
50.0 MW
4Q2026
4Q2028
4Q2029
4Q2030
-
Rubber Resources Chuckle Valley, AZ US - East 3.10 MW 4.0 MW 1Q2028 -
Giggly Grid Giggle Grove, GA 0.40 MW None Planned - -
Noodle Networks Smirk City, MI Asia 0.20 MW None Planned - -
Fuzzy Processing Titter Town, OH 7.70 MW None Planned - -
Goblin Web Services Cackle Corners, PA US - East None Available None Planned - -
Chuckling Cloud Snort Station, NC None Available 25.0 MW 3Q2028 -
Tickle Technologies Wheeze Wilds, TN None Available 7.0 MW 3Q2027 -
Bubble Bandwidth Chuckle Canyon, UT Asia 46.20 MW None Planned - -
Giggly Infrastructure Giggle Gulch, ID North America 0.80 MW None Planned - -
Silly String Storage Laugh Lake, MN Asia 1.70 MW 12.0 MW 4Q2028 -
Mystery Megacenter Comedy Central, KS Asia 3.00 MW None Planned - -
Fluffy Fortress Chucklesberg, TX Asia 2.00 MW None Planned - -
Cosmic Computing Gigglewood, CA Asia 3.00 MW 2.0 MW -
Laughing Labs Snortville, NY Asia 1.50 MW None Planned - -
Dancing Datacenter Belly Laugh, FL North America 0.80 MW None Planned - -
Silly Systems Tickletown, IL US - Central None Available 1.5 MW 1Q2027 -
Tickled Technologies Guffaw Gardens, WA Asia 17.00 MW None Planned - -
Banana Holdings Chortle Creek, OR US - Central None Available 3.2 MW 3Q2026 5.0 MW (12 Mo)
Snuggle Server Farm Snicker Springs, CO US - Central 0.30 MW 1.8 MW 1Q2028 -
Disco Digital Haha Heights, NV Asia 2.50 MW 142.5 MW 2Q2027 120.0 MW (12 Mo)
Rubber Resources Chuckle Valley, AZ US - East None Available 17 MW 4Q2026 MW (10 Mo)
Giggly Grid Giggle Grove, GA Asia 12.00 MW 20.0 MW 2Q2026 15.0 MW (12 Mo)
Noodle Networks Smirk City, MI Europe - Western None Available 40 MW 4Q2028 -
Fuzzy Processing Titter Town, OH Asia 3.50 MW 80.0 MW 2Q2027 600.0 MW (12 Mo)
Goblin Web Services Cackle Corners, PA US - West None Available 25 MW 1Q2028 -
Chuckling Cloud Snort Station, NC US - Central None Available 24 MW 2Q2027 -
Tickle Technologies Wheeze Wilds, TN Asia None Available None Planned - -
Bubble Bandwidth Chuckle Canyon, UT Asia None Available None Planned - -
Giggly Infrastructure Giggle Gulch, ID Asia 0.50 MW None Planned - -
Silly String Storage Laugh Lake, MN Asia 1.50 MW None Planned - -
Mystery Megacenter Comedy Central, KS Asia 48.00 MW None Planned - -
Fluffy Fortress Chucklesberg, TX US - East 1.00 MW 10.00 MW 4Q2026 -
Cosmic Computing Gigglewood, CA US - Central 1.00 MW None Planned - -
Laughing Labs Snortville, NY US - Central None Available 3.2 MW 2Q2028 -
Dancing Datacenter Belly Laugh, FL Asia 3.50 MW None Planned - -
Silly Systems Tickletown, IL Asia None Available None Planned - -
Tickled Technologies Guffaw Gardens, WA Asia None Available None Planned - -
Banana Holdings Chortle Creek, OR Asia 1.00 MW None Planned - -
Snuggle Server Farm Snicker Springs, CO Latin America 0.60 MW None Planned - 1.2 MW (12 Mo)
Disco Digital Haha Heights, NV US - Central 4.00 MW 16.0 MW 3Q2026 -
Rubber Resources Chuckle Valley, AZ US - West 18.00 MW None Planned - -
Giggly Grid Giggle Grove, GA US - East None Available 42 MW 4Q2026 42 MW (16 Mo)
Noodle Networks Smirk City, MI US - Central None Available 72 MW 2Q2027 72 MW (18 Mo)
Fuzzy Processing Titter Town, OH US - Central 15.00 MW 7.2 MW
15 MW
1Q2026
3Q2028
8.2 MW (21 Mo)
Goblin Web Services Cackle Corners, PA US - West None Available 16.2 MW 2Q2027 -
Chuckling Cloud Snort Station, NC US - East None Available 40 MW
40 MW
96 MW
4Q2026
3Q2027
4Q2028
-
Tickle Technologies Wheeze Wilds, TN Europe - Nordic 0.50 MW 40 MW
40 MW
40 MW
4Q2027
1Q2028
2Q2028
-
Bubble Bandwidth Chuckle Canyon, UT US - West None Available 6 MW 2Q2027 MW (15 Mo)
Giggly Infrastructure Giggle Gulch, ID US - Central None Available 720.0 MW 3Q2028 -
Silly String Storage Laugh Lake, MN US - West None Available 96 MW -
Mystery Megacenter Comedy Central, KS Europe - Western None Available 140.0 MW
9.0 MW
1Q2028
1Q2026
9.0 MW (18 Mo)
Fluffy Fortress Chucklesberg, TX Europe - Western None Available 240 MW 4Q2028 -
Cosmic Computing Gigglewood, CA 8.50 MW None Planned - -
Laughing Labs Snortville, NY Europe - Western None Available 5.4 MW 4Q2026 -
Dancing Datacenter Belly Laugh, FL Europe - Nordic 13.00 MW 24 MW
24 MW
24 MW
24 MW
24 MW
24 MW
1Q2028
1Q2028
2Q2028
2Q2028
3Q2028
3Q2028
-
Silly Systems Tickletown, IL US - Central None Available 24 MW 4Q2027 MW (22 Mo)
Tickled Technologies Guffaw Gardens, WA US - Central None Available 51 MW 4Q2027 MW (22 Mo)
Banana Holdings Chortle Creek, OR US - West None Available 22 MW 4Q2027 MW (20 Mo)
Snuggle Server Farm Snicker Springs, CO North America None Available 24 MW 3Q2028 MW (30 Mo)
Disco Digital Haha Heights, NV US - East 2.00 MW None Planned - -
Rubber Resources Chuckle Valley, AZ US - East None Available None Planned - -
Giggly Grid Giggle Grove, GA Europe - Western 1.90 MW None Planned - -
Noodle Networks Smirk City, MI US - East 0.50 MW None Planned - -
Fuzzy Processing Titter Town, OH Europe - Western 0.20 MW None Planned - -
Goblin Web Services Cackle Corners, PA US - West 2.68 MW None Planned - -
Chuckling Cloud Snort Station, NC US - Central 15.00 MW None Planned - -
Tickle Technologies Wheeze Wilds, TN US - Central 4.00 MW 10 MW
20 MW
1Q2026
2Q2026
-
Bubble Bandwidth Chuckle Canyon, UT US - Central 1.20 MW None Planned - -
Giggly Infrastructure Giggle Gulch, ID US - Central None Available None Planned - -
Silly String Storage Laugh Lake, MN US - West None Available None Planned - -
Mystery Megacenter Comedy Central, KS US - West 0.60 MW None Planned - -
Fluffy Fortress Chucklesberg, TX US - West None Available None Planned - -
Cosmic Computing Gigglewood, CA US - West 0.40 MW None Planned - -
Laughing Labs Snortville, NY US - West 6.52 MW None Planned - -
Dancing Datacenter Belly Laugh, FL US - Central 3.24 MW None Planned - -
Silly Systems Tickletown, IL US - West 2.70 MW None Planned - -
Tickled Technologies Guffaw Gardens, WA US - Central None Available 280.0 MW 4Q2027 -
Banana Holdings Chortle Creek, OR Europe - Nordic None Available 180.0 MW 4Q2029 -
Snuggle Server Farm Snicker Springs, CO US - West None Available None Planned - -
Disco Digital Haha Heights, NV US - Central None Available 5 MW 3Q2026 -
Rubber Resources Chuckle Valley, AZ US - Central 1.10 MW 1.0 MW 1Q2028 -
Giggly Grid Giggle Grove, GA US - West None Available 24.0 MW
24.0 MW
2Q2027
2Q2028
-
Noodle Networks Smirk City, MI US - East 2.07 MW None Planned - -
Fuzzy Processing Titter Town, OH US - East 2.10 MW None Planned - -
Goblin Web Services Cackle Corners, PA US - East 6.03 MW None Planned - -
Chuckling Cloud Snort Station, NC US - Central 3.04 MW None Planned - -
Tickle Technologies Wheeze Wilds, TN US - Central 3.26 MW None Planned - -
Bubble Bandwidth Chuckle Canyon, UT US - East 3.90 MW None Planned - -
Giggly Infrastructure Giggle Gulch, ID US - East 3.30 MW None Planned - -
Silly String Storage Laugh Lake, MN North America 2.13 MW None Planned - -
Mystery Megacenter Comedy Central, KS North America 2.23 MW None Planned - -
Fluffy Fortress Chucklesberg, TX US - West None Available 24 MW
24 MW
24 MW
1Q2028
2Q2028
3Q2028
-
Cosmic Computing Gigglewood, CA US - West None Available 24 MW
48 MW
1Q2028
2Q2028
-
Laughing Labs Snortville, NY US - Central None Available 352 MW 4Q2027 -
Dancing Datacenter Belly Laugh, FL US - West 2.26 MW None Planned - -
Silly Systems Tickletown, IL Europe - Western 3.47 MW None Planned - -
Tickled Technologies Guffaw Gardens, WA US - Central 2.20 MW None Planned - -
Banana Holdings Chortle Creek, OR US - West 6.06 MW None Planned - -
Snuggle Server Farm Snicker Springs, CO US - West 3.30 MW None Planned - -
Disco Digital Haha Heights, NV US - West 2.38 MW None Planned - -
Rubber Resources Chuckle Valley, AZ US - West 3.61 MW None Planned - -
Giggly Grid Giggle Grove, GA US - West 5.00 MW None Planned - -
Noodle Networks Smirk City, MI North America None Available None Planned - 5 MW (6 Mo)
Fuzzy Processing Titter Town, OH North America None Available None Planned - 5 MW (6 Mo)
Goblin Web Services Cackle Corners, PA North America None Available None Planned - 23 MW (6 Mo)
Chuckling Cloud Snort Station, NC US - Central None Available 2 MW
4 MW
1Q2026
1Q2026
-
Tickle Technologies Wheeze Wilds, TN US - Central None Available None Planned - -
Bubble Bandwidth Chuckle Canyon, UT US - Central 2.00 MW None Planned - 10.0 MW (18 Mo)
Giggly Infrastructure Giggle Gulch, ID US - Central None Available 4.0 MW
8.0 MW
4Q2026
3Q2027
-
Silly String Storage Laugh Lake, MN Oceania None Available 64 MW 2Q2026 -
Mystery Megacenter Comedy Central, KS US - East 0.23 MW None Planned - -
Fluffy Fortress Chucklesberg, TX US - East None Available 12 MW
12 MW
24 MW
24 MW
1Q2028
2Q2028
3Q2028
4Q2028
-
Cosmic Computing Gigglewood, CA US - Central None Available 24 MW
12 MW
24 MW
1Q2028
2Q2028
3Q2028
-
Laughing Labs Snortville, NY US - Central None Available 12 MW
12 MW
30 MW
2Q2028
3Q2028
4Q2028
-
Dancing Datacenter Belly Laugh, FL US - Central None Available 9.5 MW 3Q2027 38.5 MW (18 Mo)
Silly Systems Tickletown, IL Asia 4.50 MW None Planned - 18.0 MW (18 Mo)
Tickled Technologies Guffaw Gardens, WA Europe - Western 40.00 MW 240 MW 4Q2027 -
Banana Holdings Chortle Creek, OR Europe - Western None Available None Planned - -
Snuggle Server Farm Snicker Springs, CO US - East 2.50 MW None Planned - 6 MW (9 Mo)
12 MW (18 Mo)
Disco Digital Haha Heights, NV Europe - Western None Available 30.0 MW
60.0 MW
110.0 MW
500.0 MW
2Q2027
2Q2028
2Q2029
2Q2030
-
Rubber Resources Chuckle Valley, AZ US - East None Available None Planned - 50 MW (12 Mo)
50 MW (16 Mo)
50 MW (24 Mo)
Giggly Grid Giggle Grove, GA US - Central None Available 96.0 MW
192.0 MW
192.0 MW
192.0 MW
2Q2027
2Q2028
2Q2029
2Q2030
-
Noodle Networks Smirk City, MI North America None Available None Planned - 30 MW (18 Mo)
Fuzzy Processing Titter Town, OH North America None Available None Planned - 40 MW (18 Mo)
Goblin Web Services Cackle Corners, PA Asia 100.00 MW None Planned - -
Chuckling Cloud Snort Station, NC US - Central None Available 18 MW
18 MW
18 MW
18 MW
1Q2028
2Q2028
3Q2028
4Q2028
-
Tickle Technologies Wheeze Wilds, TN US - Central 0.40 MW 1.0 MW 2Q2026 -
Bubble Bandwidth Chuckle Canyon, UT 5.00 MW 6.0 MW
14.0 MW
4Q2026
2Q2027
-
Giggly Infrastructure Giggle Gulch, ID US - Central 1.00 MW None Planned - -
Silly String Storage Laugh Lake, MN Europe - Western 1.00 MW 1.2 MW 2Q2026 -
Mystery Megacenter Comedy Central, KS Europe - Western None Available 6.4 MW
6.4 MW
1Q2027
2Q2027
-
Fluffy Fortress Chucklesberg, TX US - East 5.55 MW None Planned - -
Cosmic Computing Gigglewood, CA US - Central None Available 12 MW
18 MW
1Q2028
2Q2028
-
Laughing Labs Snortville, NY US - East None Available 8 MW 2029 -
Dancing Datacenter Belly Laugh, FL US - East None Available 2 MW 3Q2026 -
Silly Systems Tickletown, IL US - East 5.00 MW None Planned - -
Tickled Technologies Guffaw Gardens, WA US - East 3.27 MW None Planned - -
Banana Holdings Chortle Creek, OR North America None Available None Planned - 5 MW (12 Mo)
Snuggle Server Farm Snicker Springs, CO US - Central None Available None Planned - 26.0 MW (18 Mo)
Disco Digital Haha Heights, NV US - Central None Available None Planned - 26.0 MW (18 Mo)
Rubber Resources Chuckle Valley, AZ US - Central None Available None Planned - 26.0 MW (18 Mo)
Giggly Grid Giggle Grove, GA US - Central None Available None Planned - 26.0 MW (18 Mo)
Noodle Networks Smirk City, MI US - East None Available None Planned - 26.0 MW (18 Mo)
Fuzzy Processing Titter Town, OH US - East None Available 2.2 MW 2Q2026 -
Goblin Web Services Cackle Corners, PA US - East None Available 9 MW 2Q2027 -
Chuckling Cloud Snort Station, NC US - East None Available 16 MW 2028 -
Tickle Technologies Wheeze Wilds, TN US - East None Available 1.5 MW 2Q2026 -
Bubble Bandwidth Chuckle Canyon, UT US - East 0.45 MW 2 MW 2026 -
Giggly Infrastructure Giggle Gulch, ID US - Central None Available 1 MW 3Q2026 -
Silly String Storage Laugh Lake, MN US - Central None Available 3 MW 3Q2026 -
Mystery Megacenter Comedy Central, KS US - Central None Available 18 MW 3Q -
Fluffy Fortress Chucklesberg, TX US - West 6.90 MW None Planned - -
Cosmic Computing Gigglewood, CA Europe - Nordic 6.50 MW None Planned - 8 MW (9 Mo)
Laughing Labs Snortville, NY Europe - Nordic 6.00 MW None Planned - -
Dancing Datacenter Belly Laugh, FL US - Central None Available 48 MW 4Q2028 -
Silly Systems Tickletown, IL US - Central None Available 18 MW
89 MW
4Q2027
1Q2029
-
Tickled Technologies Guffaw Gardens, WA US - East 6.00 MW 14 MW 4Q2026 -
Banana Holdings Chortle Creek, OR US - East None Available 6 MW 4Q2026 6 MW (12 Mo)
Snuggle Server Farm Snicker Springs, CO US - West None Available 4.2 MW
12 MW
1Q2026
1Q2027
-
Disco Digital Haha Heights, NV US - East None Available 45 MW
45 MW
96 MW
3Q2026
3Q2027
2Q2028
-
Rubber Resources Chuckle Valley, AZ US - West None Available 18 MW 3Q2027 -
Giggly Grid Giggle Grove, GA US - West None Available 36 MW 1Q2027 -
Noodle Networks Smirk City, MI US - Central None Available None Planned - 8 MW (12 Mo)
Fuzzy Processing Titter Town, OH US - East None Available 7 MW
7 MW
3Q2028
2Q2029
-
Goblin Web Services Cackle Corners, PA US - Central 0.50 MW 2.5 MW 3Q2026 -
Chuckling Cloud Snort Station, NC US - West None Available 96 MW 1Q2028 -
Tickle Technologies Wheeze Wilds, TN US - Central None Available None Planned - -
Bubble Bandwidth Chuckle Canyon, UT Latin America 11.00 MW 20 MW
37 MW
33 MW
33 MW
4Q2026
4Q2027
4Q2027
4Q2028
-
Giggly Infrastructure Giggle Gulch, ID US - Central None Available 9 MW 2Q2027 6 MW (12 Mo)
Silly String Storage Laugh Lake, MN US - Central 4.70 MW None Planned - -
Mystery Megacenter Comedy Central, KS US - East None Available 5.2 MW
8.7 MW
3Q2026
3Q2026
2.7 MW (3 Mo)
8.7 MW (9 Mo)
11.7 MW (18 Mo)
Fluffy Fortress Chucklesberg, TX Europe - Western 4.00 MW 13.5 MW
24.0 MW
24.0 MW
1Q2027
4Q2028
4Q2029
24.0 MW (18 Mo)
Cosmic Computing Gigglewood, CA Europe - Western None Available 3.0 MW 4Q2026 -
Laughing Labs Snortville, NY Europe - Western None Available 22.0 MW 1Q2028 -
Dancing Datacenter Belly Laugh, FL Europe - Western None Available 3.0 MW 4Q2027 -
Silly Systems Tickletown, IL Asia None Available 14.0 MW 1Q2028 -
Tickled Technologies Guffaw Gardens, WA Asia 1.70 MW None Planned - -
Banana Holdings Chortle Creek, OR Asia 0.60 MW None Planned - -
Snuggle Server Farm Snicker Springs, CO Asia None Available None Planned - -
Disco Digital Haha Heights, NV North America 0.60 MW 5.0 MW 4Q2027 -
Rubber Resources Chuckle Valley, AZ North America 0.60 MW None Planned - -
Giggly Grid Giggle Grove, GA US - East 0.65 MW None Planned - 3.55 MW (12 Mo)
Noodle Networks Smirk City, MI US - East None Available None Planned - 70.0 MW (12 Mo)
Fuzzy Processing Titter Town, OH US - Central None Available None Planned - 8.0 MW (18 Mo)
Goblin Web Services Cackle Corners, PA US - West None Available None Planned - 1.6 MW (12 Mo)
Chuckling Cloud Snort Station, NC Europe - Western None Available 1200 MW 3Q2027 -
Tickle Technologies Wheeze Wilds, TN Europe - Western None Available 1200 MW 3Q2027 -
Bubble Bandwidth Chuckle Canyon, UT US - Central None Available 6.0 MW 4Q2026 -
Giggly Infrastructure Giggle Gulch, ID US - East 0.80 MW None Planned - -
Silly String Storage Laugh Lake, MN Europe - Nordic None Available 23.0 MW 1Q2028 -
Mystery Megacenter Comedy Central, KS Europe - Nordic 1.90 MW 0.9 MW
21.0 MW
16.8 MW
3Q2026
1Q2027
3Q2027
-
Fluffy Fortress Chucklesberg, TX Europe - Nordic None Available 40.0 MW
40.0 MW
2Q2027
2Q2028
-
Cosmic Computing Gigglewood, CA Europe - Nordic None Available 10.5 MW
10.5 MW
4Q2027
2Q2028
-
Laughing Labs Snortville, NY Europe - Nordic None Available 143.0 MW 4Q2028 -
Dancing Datacenter Belly Laugh, FL Europe - Nordic None Available 100.0 MW
8.4 MW
60.0 MW
40.0 MW
20.0 MW
2Q2027
3Q2027
1Q2028
3Q2028
4Q2028
-
Silly Systems Tickletown, IL Europe - Western 0.48 MW None Planned - -
Tickled Technologies Guffaw Gardens, WA Europe - Western 1.70 MW 36 MW 2Q2028 -
Banana Holdings Chortle Creek, OR Europe - Western 1.00 MW None Planned - -
Snuggle Server Farm Snicker Springs, CO Africa - Sub Saharan 6.00 MW None Planned - -
Disco Digital Haha Heights, NV Europe - Western 1.50 MW None Planned - -
Rubber Resources Chuckle Valley, AZ Europe - Western 1.20 MW None Planned - -
Giggly Grid Giggle Grove, GA Europe - Western 2.50 MW None Planned - -
Noodle Networks Smirk City, MI Europe - Western 1.10 MW None Planned - -
Fuzzy Processing Titter Town, OH Europe - Western 0.45 MW None Planned - -
Goblin Web Services Cackle Corners, PA Europe - Western None Available 6 MW
40 MW
16 MW
3Q2027
1Q2030
1Q2030
-
Chuckling Cloud Snort Station, NC Europe - Western None Available 54 MW 2Q2030 -
Tickle Technologies Wheeze Wilds, TN Asia 2.65 MW None Planned - -
Bubble Bandwidth Chuckle Canyon, UT Asia 5.60 MW None Planned - -
Giggly Infrastructure Giggle Gulch, ID Asia 22.40 MW None Planned - -
Silly String Storage Laugh Lake, MN Asia None Available 16 MW 3Q2028 -
Mystery Megacenter Comedy Central, KS Asia 24.00 MW None Planned - -
Fluffy Fortress Chucklesberg, TX Asia None Available 30 MW 3Q2029 -
Cosmic Computing Gigglewood, CA Asia None Available 30 MW 3Q2031 -
Laughing Labs Snortville, NY Asia None Available 25.6 MW 2Q2026 -
Dancing Datacenter Belly Laugh, FL Asia None Available 22.4 MW 3Q2029 -
Silly Systems Tickletown, IL Asia 6.40 MW None Planned - -
Tickled Technologies Guffaw Gardens, WA Asia None Available 19.2 MW 2Q2029 -
Banana Holdings Chortle Creek, OR Asia 0.17 MW None Planned - -
Snuggle Server Farm Snicker Springs, CO Asia 22.40 MW None Planned - -
Disco Digital Haha Heights, NV Asia None Available 22.4 MW 3Q2030 -
Rubber Resources Chuckle Valley, AZ Asia None Available 22.4 MW 2Q2032 -
Giggly Grid Giggle Grove, GA Asia 2.40 MW 16 MW -
Noodle Networks Smirk City, MI US - Central None Available 250 MW 1Q2027 2000 MW (18 Mo)
Fuzzy Processing Titter Town, OH US - East None Available 750 MW 1Q2027 -
Goblin Web Services Cackle Corners, PA US - East None Available None Planned - 2000 MW (18 Mo)
Chuckling Cloud Snort Station, NC US - West None Available 15 MW 2Q2026 -
Tickle Technologies Wheeze Wilds, TN US - West None Available None Planned - -
Bubble Bandwidth Chuckle Canyon, UT Europe - Western 3.00 MW 17.0 MW 2030 10.0 MW (12 Mo)
Giggly Infrastructure Giggle Gulch, ID Europe - Nordic None Available 24.0 MW
24.0 MW
1Q2028
1Q2028
-
Silly String Storage Laugh Lake, MN US - Central None Available None Planned - -
Mystery Megacenter Comedy Central, KS US - East 2.00 MW None Planned - -
Fluffy Fortress Chucklesberg, TX US - East 0.50 MW None Planned - -
Cosmic Computing Gigglewood, CA US - East None Available 2.5 MW 4Q2026 -
Laughing Labs Snortville, NY North America None Available 64 MW 1Q2028 -
Dancing Datacenter Belly Laugh, FL US - Central 1.50 MW 4.4 MW 4Q2026 -
Silly Systems Tickletown, IL US - Central 2.93 MW None Planned - -
Tickled Technologies Guffaw Gardens, WA US - Central 3.90 MW None Planned - -
Banana Holdings Chortle Creek, OR US - Central 0.80 MW None Planned - -
Snuggle Server Farm Snicker Springs, CO US - Central 2.20 MW None Planned - -
Disco Digital Haha Heights, NV US - Central 0.63 MW None Planned - -
Rubber Resources Chuckle Valley, AZ US - Central 0.80 MW None Planned - -
Giggly Grid Giggle Grove, GA US - West 0.90 MW None Planned - -
Noodle Networks Smirk City, MI US - East 2.73 MW None Planned - -
Fuzzy Processing Titter Town, OH Europe - Nordic None Available 40.0 MW 1Q2028 -
Goblin Web Services Cackle Corners, PA Europe - Nordic None Available 40.0 MW
40.0 MW
4Q2027
1Q2028
-