Site is under construction with an anticipated completion date of 3Q2025. Photos will be provided as the site is constructed.
Built Area: 19,194.55 m²
• IT Capacity: 7.2MW – Fast Deploy
• Diesel Autonomy: 48h
• Electrical Topology: N+1
• Cooling Topology: N+1
• Dock, Reception, Office and Storage Area
• 100% renewable and certified energy consumption, reducingenvironmental impact
• Constant Data Center modernization with modern
equipment and UPS generators
• TIA-942 Rated 3
• Close TV Loop System (CCTV) recordings for 90 days
• Access Control with double-factor authentication and biometric reader
• 24x7x365 armed private security for the Data Center area
• Firefighter available 24x7x365
• Fire Detection and firefighting system equipped with inert gas, Vesdaand smoke detectors
With a track record of more than 23 years of uninterrupted operation, we are committed to building and operating the infrastructure necessary to enable the countries’ evolution into a new level of digitalization. Because scaling results is how we build the future.
WHY SCALA? We invest in our customers, positioning ourselves as true partners. We introduced the concept of reserved built-in capacity, offering unprecedented expansion possibilities in the Latin American market.
Through unique, energy-efficient buildings in our HyperCore campuses or dedicated FastDeploy MiniPods in our HyperEdge data centers, we enable our customers to enter new markets in record time with sustainable growth for decades to come.